Two Paths, Both Clear

From assessment to first charge.

Most homes take the short path below. Some need two extra steps first. Either way: no surprises, no open-ended billing once your quote is accepted.

The standard path

No panel work, no utility coordination — usually done in a single visit.

1

Free Site Assessment

We walk the site, check your panel, and map the wiring path from panel to charger — every job starts here, before any price is set.

2

Conduit & Wire Run

Heavy-gauge wire (6 AWG or thicker for future-proofing) run in protective conduit from the panel to the intended charging location.

3

Outlet or Hardwire

Install a heavy-duty NEMA 14-50 receptacle, or hardwire the Level 2 station directly into the safety disconnect switch.

Two extra steps, if your load calc needs them

These slot in right after the site assessment. See panel upgrades for how we tell whether your home needs them.

+

Service Upgrade

We coordinate directly with your utility (ComEd, Ameren, or your local provider) on upgrading your service drop (overhead, from a pole-mounted transformer) or service lateral (underground, from a pad-mounted transformer) — this only applies to a small share of homes.

+

Panel Replacement

Swap your old panel for a 200 A unit with specialized spaces for the double-pole breakers Level 2 chargers require.

Schedule your site visit

Free assessment. We'll walk the install path with you and quote it on the spot.