Before installing a Level 2 charger, we do a quick load calculation. Most panels already have the room. If yours doesn't, here's exactly what a full upgrade involves — and what it costs.
Older 100 A service can run out of breaker slots and headroom the moment a Level 2 charger joins the party. 200 A gives you the room.
Typical of homes built before the 1990s.
The current standard for EV-ready homes.
Already have 300 A or 400 A service? That's a strong starting point — though larger homes can run close to capacity too, so we'll still run the same load calc to confirm your exact headroom.
A real-world example: a 100 A home that wants to add a 40 A Level 2 charger.
Result: 100 A panel cannot support this configuration. Solution: upgrade to 200 A service.
It comes down to one question: does your panel have the headroom? We'll confirm yours during the free site assessment.
Your load calc shows enough spare capacity for the charger. We install directly — no panel work needed.
Your load calc exceeds what the panel can support. We upgrade your service to 200 A to make room.
Want the whole picture? Our guide covers how to check your own panel, the warning signs, and your options: Do You Need a Panel Upgrade for an EV Charger?
ChargeWorks installs and services every EV brand and every charger brand — the process below is the same regardless of make.
Panel condition and utility requirements vary too much house to house to price sight-unseen. Here's what goes into your number — then it's one flat price, confirmed before work starts.
Some conditions make a full upgrade non-negotiable for safety, code, and insurance reasons.
Known fire hazards. Most insurers require replacement before adding any new high-draw circuit, EV or otherwise.
Discoloration around breakers or the panel cover indicates arcing or sustained overload. Replace before adding load.
If every slot is occupied and you can't safely double-tap, you need a larger panel — alternatives won't help here.
60 A or 80 A fused service was common. Modern code requires a full replacement before any 240 V EV circuit.
We'll do a remote pre-assessment within one business day and tell you whether you need a panel upgrade or your panel already has the room.